新聞中心
新聞資訊
聯系我們

山東途暢路橋工程有限公司
聯系人:石總
電話:18264104888
地址:山東省濟南市槐蔭區經一路273號群盛華城
冷再生機使用前要做好哪方面的準備
來源:http://www.4210608.com/ 日期:2023-07-07 發布人:guanli
1、冷再生施工租賃場地準備
1. Preparation of rental site for cold regeneration construction
(1)直接填筑的路基基底,施工前必需經過檢查簽證;需求停止地基處置的基底必需完成各項處置,并滿足地基處置的請求。
(1) The roadbed base directly filled must undergo inspection and certification before construction; The foundation that requires cessation of foundation disposal must complete all disposal tasks and meet the requirements for foundation disposal.
(2)場地應該保證足夠的平整度,滿足設備、人員進場請求。
(2) The site should ensure sufficient flatness to meet the requirements for equipment and personnel entry.
(3)做好場地的暫時排水和防雨措施。依照施工運量和施工機械的大荷載建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. According to the construction traffic volume and construction machinery, a large load construction road is constructed.


2、技術準備
2. Technical preparation
冷再生機租賃廠家提醒您要做好相關人員的技術培訓和技術交底工作,使參與施工的全體人員充沛認識高速鐵路路基填筑的關鍵技術、質量控制要點。
The manufacturer of the cold recycling machine reminds you to provide technical training and disclosure to relevant personnel, so that all personnel involved in the construction can fully understand the key technologies and quality control points of high-speed railway roadbed filling.
3、勞動力、機械設備配置人員、機械設備應依據施工計劃組合工期請求停止合理的配置。路堤填筑區為一個完好的作業區,每個作業區人員配置:施工隊長1名,領工員2名,指揮卸土位置人員2名,丈量及實驗檢測人員4~6人,其他機械工、普工20~30人。
3. Labor force, mechanical equipment allocation personnel, and mechanical equipment should be requested to stop reasonable allocation based on the construction plan and construction period. The embankment filling area is a complete operation area, with one construction team leader, two foremen, two personnel commanding the unloading position, 4-6 measuring and experimental testing personnel, and 20-30 other mechanical and general workers in each operation area.
依據施工需求,每個作業面裝備反鏟發掘機一臺、宣化-140推土機一臺、YZ-22振動壓路機兩臺、天工-160平地機一臺,徐工-230灰土拌和機,自卸運輸車6輛,撒水車一臺備用。當運距較遠時,自卸車的數量可恰當增加
According to the construction requirements, each working face is equipped with one backhoe excavator, one Xuanhua 140 bulldozer, two YZ-22 vibratory rollers, one Tiangong 160 Grader, XCMG 230 lime soil mixer, six dump trucks and one sprinkler for standby. When the transportation distance is far, the number of Dump truck can be appropriately increased
冷再生機使用前要做好哪方面的準備相關內容就講解到這里了,希望能夠給您好的幫助,更多事項就來我們網站http://www.4210608.com咨詢吧!
That's all we need to do before using the cold recycling machine. We hope it can be helpful to you. For more information, please come to our website http://www.4210608.com Consult!
下一篇:冷再生機時打滑的原因及方法 上一篇:路面冷再生機構成以及其工作原理
推薦閱讀/ Recommended reading
- 路面冷再生機出租的特點和優勢 2023-07-24
- 租賃冷再生機要規避幾個重要的事項 2023-07-21
- 冷再生機保養的內容主要有什么? 2023-07-19
- 冷再生機械的特點和作用 2023-07-17
冷再生機對于水泥和瀝青施工有哪些不一樣?
[2018-08-23]
生活中我們經常見到馬路施工維修,修路先封道,經由擋土墻砌墻,石灰粉填方,排水溝修建,混凝土冷再生,水穩路面施工,瀝清冷再生,道路瀝